15 Goddard St, Toronto: 3-Storey Retail Building Renovation

3-Storey Retail Building Renovation at 15 Goddard St, Toronto was permitted on April 28, 2025 with a stated construction value of $1M to $5M. Proposal to construct 4 unit, 3 storey residential dwelling. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 15 Goddard St, Toronto |
| Neighbourhood | Bathurst Manor |
| Project | 3-Storey Retail Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | April 28, 2025 |
| Housing units | 4 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to construct 4 unit, 3 storey residential dwelling”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 4925 Dufferin St: Campus Building Renovation
- 100 Pine St: School Renovation
- 105 Wingold Ave: Office and Tenant Fit-Out
- 110 Yonge St: Office and Tenant Fit-Out
- 120 Perth Ave: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 15 Goddard St?
3-Storey Retail Building Renovation. Proposal to construct 4 unit, 3 storey residential dwelling
When was the permit issued for 15 Goddard St?
April 28, 2025, by the City of Toronto.
Who is building 15 Goddard St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 15 Goddard St need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.