1500 N Hoyne Ave, Chicago: Place of Worship Renovation

Place of Worship Renovation at 1500 N Hoyne Ave, Chicago was permitted on October 9, 2025 with a stated construction value of $1M to $5M. Spr 2019 cbrc existing:occ. group: assembly a-3, use: religious assembly proposed: no change to occupancy or use interior alterations including new ada entry, window replacement, lula elevator, partitions, and new m.e.p. work per plans. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1500 N Hoyne Ave, Chicago |
| Project | Place of Worship Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | October 9, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Spr 2019 cbrc existing:occ. group: assembly a-3, use: religious assembly proposed: no change to occupancy or use interior alterations including new ada entry, window replacement, lula elevator, partitions, and new m.e.p. work per plans”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 1137 W Altgeld St: 3-Storey Commercial Project
- 11411 S Eggleston Ave: School Renovation
- 300 S Wacker Dr: Office and Tenant Fit-Out
- 3907 S Dr Martin L King Jr Dr: Office and Tenant Fit-Out
- 4425 W North Ave: Restaurant Renovation
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1500 N Hoyne Ave?
Place of Worship Renovation. Spr 2019 cbrc existing:occ. group: assembly a-3, use: religious assembly proposed: no change to occupancy or use interior alterations including new ada entry, window replacement, lula elevator, partitions, and new m.e.p. work per plans
When was the permit issued for 1500 N Hoyne Ave?
October 9, 2025, by the City of Chicago.
Who is building 1500 N Hoyne Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1500 N Hoyne Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
