153 Montcalm Dr, Kitchener: School Renovation

School Renovation at 153 Montcalm Dr, Kitchener was permitted on June 29, 2025 with a stated construction value of $1M to $5M. Elementary School - Permit is for interior alteration and HVAC upgrades for Crestview Elementary Public School. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 153 Montcalm Dr, Kitchener |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 29, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Elementary School - Permit is for interior alteration and HVAC upgrades for Crestview Elementary Public School”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Kitchener
- 125 Seabrook Dr: Retail Building
- 200 Frederick St: Transit Facility Renovation
- 135 Bullock St: Warehouse Renovation
- 535 Manitou Dr: Office and Tenant Fit-Out
- 299 Doon Valley Dr: School Renovation
All of them: construction projects in Kitchener by address. The data is Kitchener's own building permits. Neighbouring cities issue their own permits and are not in this count. Waterloo and Cambridge issue their own permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 153 Montcalm Dr?
School Renovation. Elementary School - Permit is for interior alteration and HVAC upgrades for Crestview Elementary Public School
When was the permit issued for 153 Montcalm Dr?
June 29, 2025, by the City of Kitchener.
Who is building 153 Montcalm Dr?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 153 Montcalm Dr need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
