1633 Church St, Nashville: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 1633 Church St, Nashville was permitted on June 20, 2025 with a stated construction value of $1M to $5M. To conduct interior renovations for tenant; DIALYSIS CLINIC INC. (medical office). 17,951sf total space located on multiple levels. Renovations limited to; 1st floor renovations to lobby space and restrooms; 4th & 5th floor renovations to office, training,… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1633 Church St, Nashville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | June 20, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To conduct interior renovations for tenant; DIALYSIS CLINIC INC. (medical office). 17,951sf total space located on multiple levels. Renovations limited to; 1st floor renovations to lobby space and restrooms; 4th & 5th floor renovations to office, training,…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 565 Marriott Dr: School Renovation
- 4587 Rachels Ln: Retail Building
- 4024 B Sunnybrook Dr: Residential Project
- 5252 Hickory Hollow Pkwy: Retail Building Renovation
- 700 8th Ave S: Commercial Project Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1633 Church St?
Office and Tenant Fit-Out. To conduct interior renovations for tenant; DIALYSIS CLINIC INC. (medical office). 17,951sf total space located on multiple levels. Renovations limited to; 1st floor renovations to lobby space and restrooms; 4th & 5th floor renovations to office, training,…
When was the permit issued for 1633 Church St?
June 20, 2025, by Metro Nashville and Davidson County.
Who is building 1633 Church St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1633 Church St need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
