171 Mcintosh St, Toronto: 3-Storey Apartment Building

3-Storey Apartment Building at 171 Mcintosh St, Toronto was permitted on July 27, 2026 with a stated construction value of under $1M. Proposed new 3-storey semi- detached houseplex (4 units). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 171 Mcintosh St, Toronto |
| Project | 3-Storey Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | July 27, 2026 |
| Housing units | 4 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed new 3-storey semi- detached houseplex (4 units)”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since July 20263 other permits at this address
- July 27, 2026New construction: 3-Storey Apartment Building · under $1M (this page)
- July 29, 2026Demolition
- August 10, 2026Plumbing: demolition
- August 11, 2026Mechanical: demolition
- August 26, 2026New building · under $1M
- August 26, 2026Plumbing
- August 2026Estimated construction start (estimate)
- February 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 2217 Kingston RdAddition or alteration: interior alteration · $10M to $25M · December 2025
1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 5 to approach now, 5 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Feb 2027 | Estimate |
| Construction Site Security | Aug 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Aug 2026 – Oct 2026 | Approach now |
| Framing | Aug 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Oct 2026 | Approach now |
| Masonry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Roofing | Sep 2026 – Oct 2026 | Approach now |
| Windows, Doors and Glazing | Sep 2026 – Oct 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 72 Bexhill Ave: Residential Project
- 890 Dundas St W: Retail Building Renovation
- 2115 Finch Ave W: Office and Tenant Fit-Out
- 45 Industrial St: Apartment Building Renovation
- 151 Front St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 171 Mcintosh St?
3-Storey Apartment Building. Proposed new 3-storey semi- detached houseplex (4 units)
When was the permit issued for 171 Mcintosh St?
July 27, 2026, by the City of Toronto.
Who is building 171 Mcintosh St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 171 Mcintosh St need now?
Estimated as of October 2026, the trades to approach now are elevator; framing; painting; roofing; window, door and glazing. Already passed: site security, concrete, structural steel, masonry and waterproofing.