1750 Finch Ave E, Toronto: School Renovation

School Renovation at 1750 Finch Ave E, Toronto was permitted on February 9, 2026 with a stated construction value of under $1M. Proposal for loading dock roof slab replacement. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1750 Finch Ave E, Toronto |
| Neighbourhood | Hillcrest Village |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | February 9, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | EllisDon Construction |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for loading dock roof slab replacement”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since October 199543 other permits at this address
- January 11, 2010Addition or alteration: facade work · under $1M
- July 4, 2011Addition or alteration · under $1M
- May 12, 2016Addition or alteration: interior alteration · $1M to $5M
- December 11, 2025Addition or alteration: interior alteration · under $1M
- February 9, 2026Addition or alteration: School Renovation · under $1M (this page)
- June 23, 2026Addition or alteration: mechanical · under $1M
- March 2026Estimated construction start (estimate)
- September 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 1700 Finch Ave EAddition or alteration: facade work · $1M to $5M · December 2025
- 620 Seneca Hill DrAddition or alteration · $1M to $5M · November 2025
2 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
EllisDon Construction has 39 other projects in Builtie
- Toronto · Plumbing · over $250M · 2026
- Toronto · New building · $100M to $250M · 2025
- Toronto · Plumbing · $25M to $50M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2026 – Sep 2026 | Estimate |
| Construction Site Security | Feb 2026 – Apr 2026 | Window passed (est.) |
| Painting | Mar 2026 – May 2026 | Window passed (est.) |
| Masonry | Mar 2026 – Apr 2026 | Window passed (est.) |
| Waterproofing | Mar 2026 – Apr 2026 | Window passed (est.) |
| Roofing | Mar 2026 – May 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Mar 2026 – Apr 2026 | Window passed (est.) |
| Electrical | Apr 2026 – May 2026 | Window passed (est.) |
| HVAC and Mechanical | Apr 2026 – May 2026 | Window passed (est.) |
| Plumbing | Mar 2026 – May 2026 | Window passed (est.) |
| Fire Protection | Apr 2026 – May 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2026) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 5-21 Brahms Ave: Apartment Building Renovation
- 155 Gordon Baker Rd: Office and Tenant Fit-Out
- 3640 Victoria Park Ave: Office and Tenant Fit-Out
- 3400 Victoria Park Ave: Office and Tenant Fit-Out
- 1510 Finch Ave E: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1750 Finch Ave E?
School Renovation. Proposal for loading dock roof slab replacement
When was the permit issued for 1750 Finch Ave E?
February 9, 2026, by the City of Toronto.
Who is building 1750 Finch Ave E?
EllisDon Construction is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1750 Finch Ave E need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.