176 Wolfrey Ave, Toronto: Single-Family House Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Single-Family House Renovation at 176 Wolfrey Ave, Toronto was permitted on May 5, 2026 with a stated construction value of $1M to $5M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address176 Wolfrey Ave, Toronto
NeighbourhoodNorth Riverdale
ProjectSingle-Family House Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedMay 5, 2026
Stated construction value$1M to $5M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. May 5, 2026Drains and site services: excavation and shoring
  2. May 5, 2026Plumbing: excavation and shoring
  3. May 5, 2026Small Residential Projects: Single-Family House Renovation · $1M to $5M (this page)
  4. August 13, 2026Mechanical: excavation and shoring
  5. June 2026Estimated construction start (estimate)
  6. June 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Other big projects nearby

5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–4, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 9 passed.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Jun 2027Estimate
Construction Site SecurityApr 2026 – Jul 2026Window passed (est.)
Concrete and FoundationMay 2026 – Jun 2026Window passed (est.)
Structural SteelJun 2026 – Jul 2026Window passed (est.)
ElevatorsJun 2026 – Aug 2026Window passed (est.)
FramingJun 2026 – Aug 2026Window passed (est.)
PaintingJun 2026 – Oct 2026Approach now
MasonryJun 2026 – Jul 2026Window passed (est.)
WaterproofingJun 2026 – Jul 2026Window passed (est.)
RoofingJul 2026 – Sep 2026Window passed (est.)
Windows, Doors and GlazingJun 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (June 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 176 Wolfrey Ave?

Single-Family House Renovation. Renovation or addition to a single-family house.

When was the permit issued for 176 Wolfrey Ave?

May 5, 2026, by the City of Toronto.

Who is building 176 Wolfrey Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 176 Wolfrey Ave need now?

Estimated as of October 2026, the trades to approach now are painting. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; roofing; window, door and glazing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.