1775 St Clair Ave W, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 1775 St Clair Ave W, Toronto was permitted on August 5, 2026 with a stated construction value of under $1M. Proposed interior alterations for proposed daycare from existing vacant unit. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1775 St Clair Ave W, Toronto
ProjectOffice and Tenant Fit-Out
Building typeInstitutional
WorkRenovation or alteration
Permit issuedAugust 5, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed interior alterations for proposed daycare from existing vacant unit”

Where this project is

  1. August 5, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  2. August 5, 2026Mechanical
  3. August 5, 2026Plumbing
  4. September 2026Estimated construction start (estimate)
  5. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 1884 Davenport RdAddition or alteration: roofing · $1M to $5M · May 2026
  • 30 Weston RdAddition or alteration: interior alteration · $1M to $5M · April 2026
  • 1663 Davenport RdDesignated Structures · $1M to $5M · June 2026
  • 39 Wiltshire AveFire and life safety: fire protection · $1M to $5M · February 2026

5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–4, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now, 1 passed.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2026 – Mar 2027Estimate
Construction Site SecurityAug 2026 – Oct 2026Approach now
Concrete and FoundationAug 2026 – Sep 2026Window passed (est.)
Structural SteelSep 2026 – Oct 2026Approach now
ElevatorsSep 2026 – Oct 2026Approach now
FramingSep 2026 – Oct 2026Approach now
PaintingSep 2026 – Nov 2026Approach now
MasonrySep 2026 – Oct 2026Approach now
WaterproofingSep 2026 – Oct 2026Approach now
RoofingSep 2026 – Oct 2026Approach now
Windows, Doors and GlazingSep 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1775 St Clair Ave W?

Office and Tenant Fit-Out. Proposed interior alterations for proposed daycare from existing vacant unit

When was the permit issued for 1775 St Clair Ave W?

August 5, 2026, by the City of Toronto.

Who is building 1775 St Clair Ave W?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1775 St Clair Ave W need now?

Estimated as of October 2026, the trades to approach now are site security; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing. Already passed: concrete.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.