18 Crocker Ave, Toronto: Residential Project

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Residential Project at 18 Crocker Ave, Toronto was permitted on April 9, 2025 with a stated construction value of under $1M. Proposal for a new house by renovation permit. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address18 Crocker Ave, Toronto
NeighbourhoodTrinity-Bellwoods
ProjectResidential Project
Building typeResidential
WorkNew building
Permit issuedApril 9, 2025
Housing units3
Stated construction valueunder $1M
Estimated stageMechanical
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for a new house by renovation permit”

Where this project is

  1. Since November 20232 other permits at this address
  2. November 13, 2023Small Residential Projects
  3. January 8, 2024Plumbing: excavation and shoring
  4. January 8, 2024Drains and site services: excavation and shoring
  5. January 8, 2024Mechanical: excavation and shoring
  6. January 11, 2024Small Residential Projects: addition
  7. April 9, 2025New construction: Residential Project · under $1M (this page)
  8. May 2025Estimated construction start (estimate)
  9. November 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 3 more renovations within 1 km

  • 399 Bathurst StAddition or alteration: excavation and shoring · $10M to $25M · November 2025
  • 10 R Ordnance StNew building · $10M to $25M · April 2026
  • 91 Augusta AveAddition or alteration · $5M to $10M · January 2026
  • 180 Shaw StAddition or alteration: roofing · $1M to $5M · February 2026
  • 801 King St WAddition or alteration: interior alteration · $1M to $5M · November 2025

15 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2025 – Nov 2025Estimate
Construction Site SecurityApr 2025 – Jun 2025Window passed (est.)
PaintingMay 2025 – Jul 2025Window passed (est.)
ElectricalJun 2025 – Jul 2025Window passed (est.)
HVAC and MechanicalJun 2025 – Jul 2025Window passed (est.)
PlumbingMay 2025 – Jul 2025Window passed (est.)
Fire ProtectionJun 2025 – Jul 2025Window passed (est.)
Signage and WayfindingJul 2025 – Sep 2025Window passed (est.)
InsulationJun 2025 – Jul 2025Window passed (est.)
DrywallJun 2025 – Jul 2025Window passed (est.)
Low Voltage and DataJun 2025 – Jul 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2025) to the estimated completion (November 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 18 Crocker Ave?

Residential Project. Proposal for a new house by renovation permit

When was the permit issued for 18 Crocker Ave?

April 9, 2025, by the City of Toronto.

Who is building 18 Crocker Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 18 Crocker Ave need now?

Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.