18 Galbraith Ave, Toronto: Apartment Building
Follow this project · we email you when its status or build stage changes

Apartment Building at 18 Galbraith Ave, Toronto was permitted on September 21, 2026 with a stated construction value of $1M to $5M. Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 18 Galbraith Ave, Toronto |
| Project | Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | September 21, 2026 |
| Housing units | 5 |
| Stated construction value | $1M to $5M |
| Company named on the permit | 18 Galbraith Inc See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of…”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since September 20263 other permits at this address
- September 14, 2026New building · $1M to $5M
- September 14, 2026Drains and site services
- September 14, 2026Plumbing
- September 21, 2026New construction: Apartment Building · $1M to $5M (this page)
- September 21, 2026Mechanical
- September 23, 2026Demolition · under $1M
- October 2026Estimated construction start (estimate)
- October 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
Builtie stages each project as it moves; the trades open on it change week to week.
Find work like this in Toronto
Leads for your trade: every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1001 Queen St W: Healthcare Building Renovation
- 102 Guestville Ave: 3-Storey Retail Building Renovation
- 105 Scollard St: Office and Tenant Fit-Out
- 1076 Pape Ave: Affordable Housing Renovation
- 1117 Danforth Ave: 14-Storey Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 18 Galbraith Ave?
Apartment Building. Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of…
When was the permit issued for 18 Galbraith Ave?
September 21, 2026, by the City of Toronto.
Who is building 18 Galbraith Ave?
18 Galbraith Inc is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 18 Galbraith Ave need now?
It depends on the stage; Builtie tracks it.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
