18 Holmes Ave, Toronto: Apartment Building Renovation

Apartment Building Renovation at 18 Holmes Ave, Toronto was permitted on March 6, 2025 with a stated construction value of under $1M. Localized concrete repairs, localized elastomeric waterproofing replacement, drain replacement, drain pip replacement and foundation wall crack injection at P1 and P2. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 18 Holmes Ave, Toronto |
| Neighbourhood | Yonge-Doris |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | March 6, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Mechanical |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Localized concrete repairs, localized elastomeric waterproofing replacement, drain replacement, drain pip replacement and foundation wall crack injection at P1 and P2”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- March 6, 2025Addition or alteration: Apartment Building Renovation · under $1M (this page)
- April 2025Estimated construction start (estimate)
- October 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more renovations within 1 km
- 20 Olive AveAddition or alteration: facade work · $1M to $5M · June 2026
- 20 Church AveAddition or alteration: interior alteration · $1M to $5M · July 2026
- 5650 Yonge StAddition or alteration: demolition · $1M to $5M · March 2026
- 415 Willowdale AveAddition or alteration · $1M to $5M · April 2026
7 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2025 – Oct 2025 | Estimate |
| Construction Site Security | Mar 2025 – May 2025 | Window passed (est.) |
| Painting | Apr 2025 – Jun 2025 | Window passed (est.) |
| Electrical | May 2025 – Jun 2025 | Window passed (est.) |
| HVAC and Mechanical | May 2025 – Jun 2025 | Window passed (est.) |
| Plumbing | Apr 2025 – Jun 2025 | Window passed (est.) |
| Fire Protection | May 2025 – Jun 2025 | Window passed (est.) |
| Signage and Wayfinding | Jun 2025 – Aug 2025 | Window passed (est.) |
| Insulation | May 2025 – Jun 2025 | Window passed (est.) |
| Drywall | May 2025 – Jun 2025 | Window passed (est.) |
| Low Voltage and Data | May 2025 – Jun 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2025) to the estimated completion (October 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 4841 Yonge St: Office and Tenant Fit-Out
- 4969 Yonge St: Office and Tenant Fit-Out
- 4917-4975 Yonge St: Apartment Building Renovation
- 5440 Yonge St: Office and Tenant Fit-Out
- 5095 Yonge St: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 18 Holmes Ave?
Apartment Building Renovation. Localized concrete repairs, localized elastomeric waterproofing replacement, drain replacement, drain pip replacement and foundation wall crack injection at P1 and P2
When was the permit issued for 18 Holmes Ave?
March 6, 2025, by the City of Toronto.
Who is building 18 Holmes Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 18 Holmes Ave need now?
Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
