180 Queen St W, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 180 Queen St W, Toronto was permitted on May 25, 2026 with a stated construction value of under $1M. Proposal to replace fire alarm panel. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 180 Queen St W, Toronto |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 25, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to replace fire alarm panel”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since August 20041 other permit at this address
- August 3, 2004Non-Residential Building Permit: fire protection · $25M to $50M
- September 27, 2006Mechanical
- November 5, 2014Mechanical
- March 31, 2025Mechanical
- April 3, 2025Fire and life safety · under $1M
- May 25, 2026Fire and life safety: Office and Tenant Fit-Out · under $1M (this page)
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 8 Elm StNew building · over $250M · March 2026
- 120 Peter StMechanical · $100M to $250M · March 2026
- 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
73 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Construction Site Security | Jun 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Jul 2026 | Window passed (est.) |
| Framing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jul 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 42 Centre St: 3-Storey Retail Building
- 300 Humber College Blvd: Industrial Building Renovation
- 65 Navy Wharf Crt: Apartment Building Renovation
- 333 King St E: Residential Project Renovation
- 4 Highbourne Rd: School Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 180 Queen St W?
Office and Tenant Fit-Out. Proposal to replace fire alarm panel
When was the permit issued for 180 Queen St W?
May 25, 2026, by the City of Toronto.
Who is building 180 Queen St W?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 180 Queen St W need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.