1835 Yonge St, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 1835 Yonge St, Toronto was permitted on October 7, 2026 with a stated construction value of under $1M. Proposed interior alterations to the existing medical office. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1835 Yonge St, Toronto
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedOctober 7, 2026
Stated construction valueunder $1M
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed interior alterations to the existing medical office”

Where this project is

  1. Since January 202014 other permits at this address
  2. February 13, 2024Addition or alteration: demolition · under $1M
  3. February 23, 2024Addition or alteration: demolition · under $1M
  4. March 12, 2024Addition or alteration: interior alteration · under $1M
  5. November 13, 2025Addition or alteration · under $1M
  6. November 19, 2025Addition or alteration · under $1M
  7. October 7, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  8. October 2026Estimated construction start (estimate)
  9. May 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1835 Yonge St?

Office and Tenant Fit-Out. Proposed interior alterations to the existing medical office

When was the permit issued for 1835 Yonge St?

October 7, 2026, by the City of Toronto.

Who is building 1835 Yonge St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1835 Yonge St need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.