184 College St, Toronto: Campus Building Renovation

Campus Building Renovation at 184 College St, Toronto was permitted on March 23, 2026 with a stated construction value of under $1M. Proposal for interior alterations to three washrooms on the second floor in the Wallberg Building. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 184 College St, Toronto |
| Project | Campus Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | March 23, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alterations to three washrooms on the second floor in the Wallberg Building”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 18, 2019Mechanical
- May 9, 2022Plumbing · under $1M
- March 23, 2026Addition or alteration: Campus Building Renovation · under $1M (this page)
- March 30, 2026Plumbing
- March 30, 2026Mechanical
- April 2026Estimated construction start (estimate)
- October 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more renovations within 1 km
- 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
- 150 College StAddition or alteration: demolition · $25M to $50M · May 2026
- 555 University AveAddition or alteration: demolition · $25M to $50M · February 2026
- 124 Edward StAddition or alteration: elevator · $10M to $25M · March 2026
- 112 College StAddition or alteration: interior alteration · $10M to $25M · June 2026
31 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2026 – Oct 2026 | Estimate |
| Construction Site Security | Apr 2026 – May 2026 | Window passed (est.) |
| Painting | May 2026 – Jun 2026 | Window passed (est.) |
| Masonry | Apr 2026 – May 2026 | Window passed (est.) |
| Waterproofing | Apr 2026 – May 2026 | Window passed (est.) |
| Roofing | May 2026 – Jun 2026 | Window passed (est.) |
| Windows, Doors and Glazing | May 2026 – Jun 2026 | Window passed (est.) |
| Electrical | May 2026 – Jun 2026 | Window passed (est.) |
| HVAC and Mechanical | May 2026 – Jun 2026 | Window passed (est.) |
| Plumbing | May 2026 – Jun 2026 | Window passed (est.) |
| Fire Protection | May 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 11 Sullivan St: Apartment Building Renovation
- 435 Eglinton Ave E: Apartment Building Renovation
- 130 Wolseley St: Apartment Building Renovation
- 604 Bay St: Transit Facility Renovation
- 18 Preston Rd: Residential Project Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 184 College St?
Campus Building Renovation. Proposal for interior alterations to three washrooms on the second floor in the Wallberg Building
When was the permit issued for 184 College St?
March 23, 2026, by the City of Toronto.
Who is building 184 College St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 184 College St need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
