1876 A Keele St, Toronto: Residential Project

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Residential Project at 1876 A Keele St, Toronto was permitted on July 6, 2026 with a stated construction value of under $1M. Proposed new Fourplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1876 A Keele St, Toronto
ProjectResidential Project
Building typeResidential
WorkNew building
Permit issuedJuly 6, 2026
Housing units4
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed new Fourplex”

Where this project is

  1. July 6, 2026New construction: Residential Project · under $1M (this page)
  2. July 6, 2026Demolition
  3. September 1, 2026Mechanical
  4. September 1, 2026Drains and site services
  5. September 1, 2026Plumbing
  6. July 2026Estimated construction start (estimate)
  7. February 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

2 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jul 2026 – Feb 2027Estimate
Construction Site SecurityJun 2026 – Aug 2026Window passed (est.)
Concrete and FoundationJul 2026Window passed (est.)
Structural SteelJul 2026 – Aug 2026Window passed (est.)
ElevatorsJul 2026 – Aug 2026Window passed (est.)
FramingJul 2026 – Aug 2026Window passed (est.)
PaintingJul 2026 – Sep 2026Window passed (est.)
MasonryJul 2026 – Aug 2026Window passed (est.)
WaterproofingJul 2026 – Aug 2026Window passed (est.)
RoofingAug 2026 – Sep 2026Window passed (est.)
Windows, Doors and GlazingJul 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1876 A Keele St?

Residential Project. Proposed new Fourplex

When was the permit issued for 1876 A Keele St?

July 6, 2026, by the City of Toronto.

Who is building 1876 A Keele St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1876 A Keele St need now?

Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.