1900 Keele St, Toronto: School Renovation

School Renovation at 1900 Keele St, Toronto was permitted on June 15, 2026 with a stated construction value of under $1M. Proposal for window replacement including localized steel column repair, and restoration of the west exterior wall. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1900 Keele St, Toronto |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 15, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Toronto District School Board |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for window replacement including localized steel column repair, and restoration of the west exterior wall”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- December 9, 2003Designated Structures · under $1M
- February 27, 2018Plumbing
- June 15, 2026Addition or alteration: School Renovation · under $1M (this page)
- June 15, 2026Mechanical: facade work
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 55 Lonborough AveNew construction: demolition · $1M to $5M · March 2026
2 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Toronto District School Board has 14 other projects in Builtie
- Toronto · Addition or alteration · $1M to $5M · 2025
- Toronto · Addition or alteration: structural work · $1M to $5M · 2025
- Toronto · Addition or alteration · $1M to $5M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jun 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 100 Carlton St: School Renovation
- 360 Bay St: Office and Tenant Fit-Out
- 103 Bowie Ave: Residential Project
- 800 Kennedy Rd: Apartment Building Renovation
- 105 Bowie Ave: Residential Project
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1900 Keele St?
School Renovation. Proposal for window replacement including localized steel column repair, and restoration of the west exterior wall
When was the permit issued for 1900 Keele St?
June 15, 2026, by the City of Toronto.
Who is building 1900 Keele St?
Toronto District School Board is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1900 Keele St need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
