1901 Mccowan Rd, Toronto: Transit Facility

Transit Facility at 1901 Mccowan Rd, Toronto was permitted on June 9, 2025 with a stated construction value of under $1M. Portable Office at the construction site at 1901 McCowan Road for Launch Shaft 1 (LS-1) construction for the Advanced Tunnel for Scarborough Subway Extension project. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1901 Mccowan Rd, Toronto |
| Project | Transit Facility |
| Building type | Institutional |
| Work | New building |
| Permit issued | June 9, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Portable Office at the construction site at 1901 McCowan Road for Launch Shaft 1 (LS-1) construction for the Advanced Tunnel for Scarborough Subway Extension project”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- June 9, 2025New construction: Transit Facility · under $1M (this page)
- July 2025Estimated construction start (estimate)
- January 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 47 Milner AveAddition or alteration: interior alteration · $1M to $5M · July 2026
1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2025 – Jan 2026 | Estimate |
| Fire Protection | Aug 2025 – Sep 2025 | Window passed (est.) |
| Signage and Wayfinding | Sep 2025 – Nov 2025 | Window passed (est.) |
| Insulation | Aug 2025 – Sep 2025 | Window passed (est.) |
| Drywall | Aug 2025 – Sep 2025 | Window passed (est.) |
| Low Voltage and Data | Aug 2025 – Sep 2025 | Window passed (est.) |
| Tile | Sep 2025 – Oct 2025 | Window passed (est.) |
| Cabinetry and Millwork | Aug 2025 – Sep 2025 | Window passed (est.) |
| Flooring | Sep 2025 – Oct 2025 | Window passed (est.) |
| Countertops | Sep 2025 – Oct 2025 | Window passed (est.) |
| Finish Carpentry | Sep 2025 – Oct 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2025) to the estimated completion (January 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 2050 Jane St: Commercial Project Renovation
- 20 Beverly Hills Dr: School Renovation
- 250 Manitoba St: Utility Facility Renovation
- 330 Bay St: Apartment Building Renovation
- 7 Aldershot Cres: Utility Facility Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1901 Mccowan Rd?
Transit Facility. Portable Office at the construction site at 1901 McCowan Road for Launch Shaft 1 (LS-1) construction for the Advanced Tunnel for Scarborough Subway Extension project
When was the permit issued for 1901 Mccowan Rd?
June 9, 2025, by the City of Toronto.
Who is building 1901 Mccowan Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1901 Mccowan Rd need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
