1980 St Clair Ave W, Toronto: Retail Building Renovation

Retail Building Renovation at 1980 St Clair Ave W, Toronto was permitted on July 17, 2026 with a stated construction value of under $1M. Proposed interior demolition, bringing existing unit back to shell conditions - Unit A130. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1980 St Clair Ave W, Toronto |
| Project | Retail Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | July 17, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed interior demolition, bringing existing unit back to shell conditions - Unit A130”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since December 201339 other permits at this address
- December 10, 2013Addition or alteration: mechanical · under $1M
- July 22, 2015Addition or alteration: structural work · under $1M
- July 18, 2017Addition or alteration: interior alteration · under $1M
- November 7, 2023Addition or alteration: fire protection · under $1M
- March 13, 2024Addition · $1M to $5M
- July 17, 2026Addition or alteration: Retail Building Renovation · under $1M (this page)
- July 2026Estimated construction start (estimate)
- February 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 436 Pacific AveNew construction: demolition · $1M to $5M · August 2026
- 30 Weston RdAddition or alteration: interior alteration · $1M to $5M · April 2026
- 600-604 Rogers RdAddition or alteration: interior alteration · $1M to $5M · September 2026
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 9 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Feb 2027 | Estimate |
| Construction Site Security | Jul 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Sep 2026 | Window passed (est.) |
| Framing | Jul 2026 – Sep 2026 | Window passed (est.) |
| Painting | Aug 2026 – Oct 2026 | Approach now |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 15 Summerland Ter: Office and Tenant Fit-Out
- 8 Market St: Office and Tenant Fit-Out
- 44 King St W: Office and Tenant Fit-Out
- 85 Forty First St: School Renovation
- 2603 Bathurst St: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1980 St Clair Ave W?
Retail Building Renovation. Proposed interior demolition, bringing existing unit back to shell conditions - Unit A130
When was the permit issued for 1980 St Clair Ave W?
July 17, 2026, by the City of Toronto.
Who is building 1980 St Clair Ave W?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1980 St Clair Ave W need now?
Estimated as of October 2026, the trades to approach now are painting. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; roofing; window, door and glazing.