2 Church St, Toronto: Parking Structure Renovation

Parking Structure Renovation at 2 Church St, Toronto was permitted on October 3, 2025 with a stated construction value of $5M to $10M. Proposal for concrete repairs and replace stormwater and sanitary systems including catchbasins. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2 Church St, Toronto |
| Neighbourhood | St Lawrence-East Bayfront-The Islands |
| Project | Parking Structure Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | October 3, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for concrete repairs and replace stormwater and sanitary systems including catchbasins”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 61 Front St W: Transit Facility Renovation
- 20 Bay St: Apartment Building Renovation
- 10-20 Bay St: Office and Tenant Fit-Out
- 10 Yonge St: Apartment Building Renovation
- 261 Queens Quay: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2 Church St?
Parking Structure Renovation. Proposal for concrete repairs and replace stormwater and sanitary systems including catchbasins
When was the permit issued for 2 Church St?
October 3, 2025, by the City of Toronto.
Who is building 2 Church St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2 Church St need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.