2 Willowhurst Cres, Toronto: Single-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Single-Family House at 2 Willowhurst Cres, Toronto was permitted on August 15, 2025 with a stated construction value of $1M to $5M. New single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address2 Willowhurst Cres, Toronto
NeighbourhoodWexford/Maryvale
ProjectSingle-Family House
Building typeResidential
WorkNew building
Permit issuedAugust 15, 2025
Housing units3
Stated construction value$1M to $5M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. August 15, 2025New construction: Single-Family House ยท $1M to $5M (this page)
  2. August 19, 2025Demolition
  3. October 28, 2025Plumbing: demolition
  4. November 21, 2025Mechanical: demolition
  5. September 2025Estimated construction start (estimate)
  6. September 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2025 – Sep 2026Estimate
Fire ProtectionNov 2025 – Jan 2026Window passed (est.)
Signage and WayfindingFeb 2026 – May 2026Window passed (est.)
InsulationNov 2025 – Feb 2026Window passed (est.)
DrywallDec 2025 – Feb 2026Window passed (est.)
Low Voltage and DataDec 2025 – Feb 2026Window passed (est.)
TileJan 2026 – Mar 2026Window passed (est.)
Cabinetry and MillworkDec 2025 – Feb 2026Window passed (est.)
FlooringJan 2026 – Mar 2026Window passed (est.)
CountertopsJan 2026 – Mar 2026Window passed (est.)
Finish CarpentryJan 2026 – Mar 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (September 2025) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 2 Willowhurst Cres?

Single-Family House. New single-family house.

When was the permit issued for 2 Willowhurst Cres?

August 15, 2025, by the City of Toronto.

Who is building 2 Willowhurst Cres?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 2 Willowhurst Cres need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.