School Renovation at 20 Evermede Dr, Toronto was permitted on February 2, 2026 with a stated construction value of $1M to $5M. Proposal to replace existing roof deck and roof assembly with new steel roof deck and new assembly (Donview Middle Health and Wellness Academy - TDSB). Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address20 Evermede Dr, Toronto
NeighbourhoodFenside-Parkwoods
ProjectSchool Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedFebruary 2, 2026
Stated construction value$1M to $5M
Estimated stageFraming
Company named on the permitGym-Con Ltd
Decision makers and contactsIn Builtie

From the permit: “Proposal to replace existing roof deck and roof assembly with new steel roof deck and new assembly (Donview Middle Health and Wellness Academy - TDSB)”

Which trades are being bought now

The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 20 Evermede Dr?

School Renovation. Proposal to replace existing roof deck and roof assembly with new steel roof deck and new assembly (Donview Middle Health and Wellness Academy - TDSB)

When was the permit issued for 20 Evermede Dr?

February 2, 2026, by the City of Toronto.

Who is building 20 Evermede Dr?

Gym-Con Ltd is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 20 Evermede Dr need now?

At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.