201 N Morgan St, Chicago: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 201 N Morgan St, Chicago was permitted on December 8, 2025 with a stated construction value of $1M to $5M. Sc 2019 cbc: interior alterations to an existing restaurant space in ground floor and basement of a 3-story building. construction type: iv-ht; occupancy: a-2 assembly. no change to use or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 201 N Morgan St, Chicago |
| Project | Office and Tenant Fit-Out |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | December 8, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Splitt, Jonathan D |
| Decision makers and contacts | In Builtie |
From the permit: “Sc 2019 cbc: interior alterations to an existing restaurant space in ground floor and basement of a 3-story building. construction type: iv-ht; occupancy: a-2 assembly. no change to use or occupancy”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 103 E Oak St: Office and Tenant Fit-Out
- 1032 W Fulton Market: Office and Tenant Fit-Out
- 1125 W Loyola Ave: Student Residence Renovation
- 1280 N Milwaukee Ave: 4-Storey Retail Building
- 150 W Roosevelt Rd: Retail Building Renovation
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 201 N Morgan St?
Office and Tenant Fit-Out. Sc 2019 cbc: interior alterations to an existing restaurant space in ground floor and basement of a 3-story building. construction type: iv-ht; occupancy: a-2 assembly. no change to use or occupancy
When was the permit issued for 201 N Morgan St?
December 8, 2025, by the City of Chicago.
Who is building 201 N Morgan St?
Splitt, Jonathan D is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 201 N Morgan St need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
