2020 Lindell Ave, Nashville: Commercial Project Renovation

Commercial Project Renovation at 2020 Lindell Ave, Nashville was permitted on April 29, 2025 with a stated construction value of $1M to $5M. To conduct renovations to existing space for aura event center. no change to footprint.**footprint change due to new mechanical platform**the cost on the application is incorrect and does not reflect the work required for this permit** bb poc tim… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2020 Lindell Ave, Nashville |
| Project | Commercial Project Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | April 29, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To conduct renovations to existing space for aura event center. no change to footprint.**footprint change due to new mechanical platform**the cost on the application is incorrect and does not reflect the work required for this permit** bb poc tim…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 11 Paseo Pl: Apartment Building Renovation
- 2601 Jess Neely Dr: School Renovation
- 3204 B Whites Creek Pike: Warehouse Renovation
- 4220 Harding Pike: Institutional Project Renovation
- 1116 Visco Dr: Warehouse Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2020 Lindell Ave?
Commercial Project Renovation. To conduct renovations to existing space for aura event center. no change to footprint.**footprint change due to new mechanical platform**the cost on the application is incorrect and does not reflect the work required for this permit** bb poc tim…
When was the permit issued for 2020 Lindell Ave?
April 29, 2025, by Metro Nashville and Davidson County.
Who is building 2020 Lindell Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2020 Lindell Ave need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
