Figures read October 25, 2026 from Builtie's permit data.

Accessory Dwelling Unit Renovation at 204 Gladstone Ave, Toronto was permitted on July 13, 2026 with a stated construction value of under $1M. Renovation or addition to an accessory dwelling unit. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address204 Gladstone Ave, Toronto
ProjectAccessory Dwelling Unit Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedJuly 13, 2026
Housing units1
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. July 13, 2026Small Residential Projects: Accessory Dwelling Unit Renovation · under $1M (this page)
  2. July 13, 2026Mechanical
  3. July 13, 2026Drains and site services
  4. July 13, 2026Plumbing
  5. August 2026Estimated construction start (estimate)
  6. February 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

7 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 2 to approach now, 8 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Feb 2027Estimate
Construction Site SecurityJul 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Sep 2026Window passed (est.)
FramingAug 2026 – Sep 2026Window passed (est.)
PaintingAug 2026 – Oct 2026Approach now
MasonryAug 2026 – Sep 2026Window passed (est.)
WaterproofingAug 2026 – Sep 2026Window passed (est.)
RoofingAug 2026 – Oct 2026Approach now
Windows, Doors and GlazingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 204 Gladstone Ave?

Accessory Dwelling Unit Renovation. Renovation or addition to an accessory dwelling unit.

When was the permit issued for 204 Gladstone Ave?

July 13, 2026, by the City of Toronto.

Who is building 204 Gladstone Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 204 Gladstone Ave need now?

Estimated as of October 2026, the trades to approach now are painting and roofing. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; window, door and glazing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.