205 New Toronto St, Toronto: Warehouse Renovation

Ironworkers erecting a structural steel frame on a construction site
Figures read October 24, 2026 from Builtie's permit data.

Warehouse Renovation at 205 New Toronto St, Toronto was permitted on May 21, 2026 with a stated construction value of under $1M. This project consists of installation of a back flow preventer device on sprinkler system in an existing distribution facility. OBC class F. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address205 New Toronto St, Toronto
ProjectWarehouse Renovation
Building typeIndustrial
WorkRenovation or alteration
Permit issuedMay 21, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “This project consists of installation of a back flow preventer device on sprinkler system in an existing distribution facility. OBC class F”

Where this project is

  1. Since March 20062 other permits at this address
  2. March 27, 2006New building · $10M to $25M
  3. January 12, 2011Addition or alteration · under $1M
  4. January 24, 2011Addition or alteration · under $1M
  5. January 9, 2020Plumbing · under $1M
  6. January 28, 2022Plumbing · under $1M
  7. May 21, 2026Fire and life safety: Warehouse Renovation · under $1M (this page)
  8. June 2026Estimated construction start (estimate)
  9. December 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Dec 2026Estimate
Construction Site SecurityMay 2026 – Jul 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)
MasonryJun 2026 – Jul 2026Window passed (est.)
WaterproofingJun 2026 – Jul 2026Window passed (est.)
RoofingJun 2026 – Aug 2026Window passed (est.)
Windows, Doors and GlazingJun 2026 – Jul 2026Window passed (est.)
ElectricalJul 2026 – Aug 2026Window passed (est.)
HVAC and MechanicalJul 2026 – Aug 2026Window passed (est.)
PlumbingJun 2026 – Aug 2026Window passed (est.)
Fire ProtectionJul 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 205 New Toronto St?

Warehouse Renovation. This project consists of installation of a back flow preventer device on sprinkler system in an existing distribution facility. OBC class F

When was the permit issued for 205 New Toronto St?

May 21, 2026, by the City of Toronto.

Who is building 205 New Toronto St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 205 New Toronto St need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.