2103 Woodmont Blvd, Nashville: Place of Worship

Place of Worship at 2103 Woodmont Blvd, Nashville was permitted on June 9, 2026 with a stated construction value of $1M to $5M. To construct a 18,900 square foot Family Life Center for Woodmont Christian Church. Special Exception 17.16.170 POC: Emilee Wilson Hamm 615.329.1399. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2103 Woodmont Blvd, Nashville |
| Project | Place of Worship |
| Building type | Institutional |
| Work | New building |
| Permit issued | June 9, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To construct a 18,900 square foot Family Life Center for Woodmont Christian Church. Special Exception 17.16.170 POC: Emilee Wilson Hamm 615.329.1399”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1220 Rosa L Parks Blvd: Office and Tenant Fit-Out
- 1909 15th Ave S: School Renovation
- 160 2nd Ave N: 2-Storey Condominium Renovation
- 109 Gallatin Pike N: Retail Building Renovation
- 21 Platform Way S: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2103 Woodmont Blvd?
Place of Worship. To construct a 18,900 square foot Family Life Center for Woodmont Christian Church. Special Exception 17.16.170 POC: Emilee Wilson Hamm 615.329.1399
When was the permit issued for 2103 Woodmont Blvd?
June 9, 2026, by Metro Nashville and Davidson County.
Who is building 2103 Woodmont Blvd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2103 Woodmont Blvd need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
