2120 N Mozart St, Chicago: Place of Worship Renovation

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

Place of Worship Renovation at 2120 N Mozart St, Chicago was permitted on June 23, 2025 with a stated construction value of $5M to $10M. Dds 2019 cbrc: renovation and adaptive reuse of the existing humboldt park united methodist church. existing use is a sanctuary and 13 units. the sanctuary will be converted into 9 additional units including a new dormer. the existing 13 units will be… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address2120 N Mozart St, Chicago
ProjectPlace of Worship Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedJune 23, 2025
Stated construction value$5M to $10M
Estimated stageFraming
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Dds 2019 cbrc: renovation and adaptive reuse of the existing humboldt park united methodist church. existing use is a sanctuary and 13 units. the sanctuary will be converted into 9 additional units including a new dormer. the existing 13 units will be…”

Which trades are being bought now

The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Chicago

All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 2120 N Mozart St?

Place of Worship Renovation. Dds 2019 cbrc: renovation and adaptive reuse of the existing humboldt park united methodist church. existing use is a sanctuary and 13 units. the sanctuary will be converted into 9 additional units including a new dormer. the existing 13 units will be…

When was the permit issued for 2120 N Mozart St?

June 23, 2025, by the City of Chicago.

Who is building 2120 N Mozart St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 2120 N Mozart St need now?

At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.