22 Birchlea Ave, Toronto: 2-Storey Duplex

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

2-Storey Duplex at 22 Birchlea Ave, Toronto was permitted on July 31, 2026 with a stated construction value of under $1M. New duplex, 2 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address22 Birchlea Ave, Toronto
Project2-Storey Duplex
Building typeResidential
WorkNew building
Storeys2
Permit issuedJuly 31, 2026
Housing units1
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permit1001289744 Ontario Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. July 2, 2026Drains and site services: demolition
  2. July 2, 2026Mechanical: demolition
  3. July 2, 2026Plumbing: demolition
  4. July 31, 2026New construction: 2-Storey Duplex · under $1M (this page)
  5. September 15, 2026Demolition
  6. August 2026Estimated construction start (estimate)
  7. February 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 5 to approach now, 5 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Feb 2027Estimate
Construction Site SecurityAug 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026 – Sep 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Oct 2026Approach now
FramingAug 2026 – Oct 2026Approach now
PaintingSep 2026 – Nov 2026Approach now
MasonryAug 2026 – Sep 2026Window passed (est.)
WaterproofingAug 2026 – Sep 2026Window passed (est.)
RoofingSep 2026 – Oct 2026Approach now
Windows, Doors and GlazingSep 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 22 Birchlea Ave?

2-Storey Duplex. New duplex, 2 storeys.

When was the permit issued for 22 Birchlea Ave?

July 31, 2026, by the City of Toronto.

Who is building 22 Birchlea Ave?

1001289744 Ontario Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 22 Birchlea Ave need now?

Estimated as of October 2026, the trades to approach now are elevator; framing; painting; roofing; window, door and glazing. Already passed: site security, concrete, structural steel, masonry and waterproofing.