222 N La Salle St, Chicago: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 222 N La Salle St, Chicago was permitted on March 12, 2026 with a stated construction value of $5M to $10M. Self-certification 2019 cbrc: interior alteration of existing office space in an existing high rise office building. the scope of work includes minor demolition of temporary lighting, installation of new drywall, glass, doors, flooring, millwork, and led… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 222 N La Salle St, Chicago |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | March 12, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Self-certification 2019 cbrc: interior alteration of existing office space in an existing high rise office building. the scope of work includes minor demolition of temporary lighting, installation of new drywall, glass, doors, flooring, millwork, and led…”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 1 W Grand Ave: Office and Tenant Fit-Out
- 10 S Riverside Plz: Office and Tenant Fit-Out
- 104 E Oak St: 3-Storey Apartment Building Renovation
- 1221 W Belmont Ave: 5-Storey Mixed-Use Building
- 150 N Riverside Plz: Office and Tenant Fit-Out
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 222 N La Salle St?
Office and Tenant Fit-Out. Self-certification 2019 cbrc: interior alteration of existing office space in an existing high rise office building. the scope of work includes minor demolition of temporary lighting, installation of new drywall, glass, doors, flooring, millwork, and led…
When was the permit issued for 222 N La Salle St?
March 12, 2026, by the City of Chicago.
Who is building 222 N La Salle St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 222 N La Salle St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
