225 King St W, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 225 King St W, Toronto was permitted on October 21, 2026 with a stated construction value of $1M to $5M. Interior Alteration for a Group D occupancy on the Eleventh floor for office staff. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address225 King St W, Toronto
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedOctober 21, 2026
Stated construction value$1M to $5M
Estimated stagePermit
Company named on the permit360 Design Construction Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Interior Alteration for a Group D occupancy on the Eleventh floor for office staff”

Where this project is

  1. Since October 20009 other permits at this address
  2. October 5, 2000Non-Residential Building Permit: interior alteration · under $1M
  3. July 20, 2001Addition or alteration: interior alteration · under $1M
  4. August 12, 2026Addition or alteration: interior alteration
  5. August 17, 2026Mechanical
  6. October 16, 2026Fire and life safety: fire protection · under $1M
  7. October 21, 2026Addition or alteration: Office and Tenant Fit-Out · $1M to $5M (this page)
  8. November 2026Estimated construction start (estimate)
  9. November 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 2 to approach now, 5 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Nov 2026 – Nov 2027Estimate
Excavation and Site WorkOct 2026 – Nov 2026Approach now
Construction Site SecurityOct 2026 – Jan 2027Approach now
Concrete and FoundationNov 2026 – Dec 2026Coming up
Structural SteelNov 2026 – Jan 2027Coming up
ElevatorsNov 2026 – Feb 2027Coming up
FramingNov 2026 – Feb 2027Coming up
PaintingDec 2026 – Mar 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (November 2026) to the estimated completion (November 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 225 King St W?

Office and Tenant Fit-Out. Interior Alteration for a Group D occupancy on the Eleventh floor for office staff

When was the permit issued for 225 King St W?

October 21, 2026, by the City of Toronto.

Who is building 225 King St W?

360 Design Construction Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 225 King St W need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security. Coming up: concrete from November 2026, structural steel from November 2026, elevator from November 2026, framing from November 2026 and painting from December 2026.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.