2308 E Hillside Dr, Broken Arrow: School Renovation

School Renovation at 2308 E Hillside Dr, Broken Arrow was permitted on December 5, 2025. Goldfish Swim School - A Goldfish Swim School is a state-of-the-art aquatic swimming facility that is dedicated to indoor swimming classes and programs for children 4 months and older. Clients are building out a total of +- 7,540SF in the existing space. This… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2308 E Hillside Dr, Broken Arrow |
| Project | School Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | December 5, 2025 |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Goldfish Swim School - A Goldfish Swim School is a state-of-the-art aquatic swimming facility that is dedicated to indoor swimming classes and programs for children 4 months and older. Clients are building out a total of +- 7,540SF in the existing space. This…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Broken Arrow
- 2600 N 23rd St: Commercial Project
- 2600 W Oakland Pl: Commercial Project
- 1907 W Norfolk Dr: Commercial Project
- 604 N 45th St: Commercial Project
- 2248 E Hillside Dr: Commercial Project Renovation
All of them: construction projects in Broken Arrow by address. The data is Broken Arrow's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a smaller feed than Tulsa's, so the counts move more from month to month.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2308 E Hillside Dr?
School Renovation. Goldfish Swim School - A Goldfish Swim School is a state-of-the-art aquatic swimming facility that is dedicated to indoor swimming classes and programs for children 4 months and older. Clients are building out a total of +- 7,540SF in the existing space. This…
When was the permit issued for 2308 E Hillside Dr?
December 5, 2025, by the City of Broken Arrow.
Who is building 2308 E Hillside Dr?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2308 E Hillside Dr need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
