235 Queens Quay, Toronto: Apartment Building Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Apartment Building Renovation at 235 Queens Quay, Toronto was permitted on September 30, 2026 with a stated construction value of $1M to $5M. Proposal for rooftop units replacement. - Harbourfront Centre Toronto. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address235 Queens Quay, Toronto
ProjectApartment Building Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedSeptember 30, 2026
Stated construction value$1M to $5M
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for rooftop units replacement. - Harbourfront Centre Toronto”

Where this project is

  1. Since November 201023 other permits at this address
  2. November 16, 2010Addition or alteration: interior alteration · under $1M
  3. January 6, 2020Addition or alteration: roofing · $1M to $5M
  4. March 11, 2022Addition or alteration: roofing · $1M to $5M
  5. January 13, 2023Addition or alteration · under $1M
  6. September 30, 2026Mechanical: Apartment Building Renovation · $1M to $5M (this page)
  7. October 7, 2026Addition or alteration · under $1M
  8. October 2026Estimated construction start (estimate)
  9. October 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 235 Queens Quay?

Apartment Building Renovation. Proposal for rooftop units replacement. - Harbourfront Centre Toronto

When was the permit issued for 235 Queens Quay?

September 30, 2026, by the City of Toronto.

Who is building 235 Queens Quay?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 235 Queens Quay need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.