240 Maplewood Ave, Toronto: Single-Family House Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Single-Family House Renovation at 240 Maplewood Ave, Toronto was permitted on October 22, 2026 with a stated construction value of under $1M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address240 Maplewood Ave, Toronto
ProjectSingle-Family House Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedOctober 22, 2026
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. October 22, 2026Small Residential Projects: Single-Family House Renovation ยท under $1M (this page)
  2. October 23, 2026Drains and site services: excavation and shoring
  3. October 23, 2026Plumbing: excavation and shoring
  4. November 2026Estimated construction start (estimate)
  5. May 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 4 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Nov 2026 – May 2027Estimate
Excavation and Site WorkOct 2026 – Nov 2026Approach now
Construction Site SecurityOct 2026 – Dec 2026Approach now
Concrete and FoundationOct 2026 – Nov 2026Approach now
Structural SteelNov 2026 – Dec 2026Coming up
ElevatorsNov 2026 – Dec 2026Coming up
FramingNov 2026 – Dec 2026Coming up
PaintingNov 2026 – Jan 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (November 2026) to the estimated completion (May 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 240 Maplewood Ave?

Single-Family House Renovation. Renovation or addition to a single-family house.

When was the permit issued for 240 Maplewood Ave?

October 22, 2026, by the City of Toronto.

Who is building 240 Maplewood Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 240 Maplewood Ave need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete. Coming up: structural steel from November 2026, elevator from November 2026, framing from November 2026 and painting from November 2026.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.