250 Bloor St E, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 250 Bloor St E, Toronto was permitted on August 12, 2026 with a stated construction value of $1M to $5M. Proposed new offices for manulife loor 8. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address250 Bloor St E, Toronto
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedAugust 12, 2026
Stated construction value$1M to $5M
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed new offices for manulife loor 8”

Where this project is

  1. Since June 200076 other permits at this address
  2. July 22, 2005Addition or alteration: roofing · $1M to $5M
  3. July 20, 2006Addition or alteration · under $1M
  4. July 30, 2007Addition or alteration: roofing · under $1M
  5. September 17, 2014Addition or alteration: interior alteration · under $1M
  6. September 17, 2014Addition or alteration: interior alteration · under $1M
  7. August 12, 2026Addition or alteration: Office and Tenant Fit-Out · $1M to $5M (this page)
  8. September 2026Estimated construction start (estimate)
  9. September 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 250 Bloor St E?

Office and Tenant Fit-Out. Proposed new offices for manulife loor 8

When was the permit issued for 250 Bloor St E?

August 12, 2026, by the City of Toronto.

Who is building 250 Bloor St E?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 250 Bloor St E need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.