2511 Mcgavock Pike, Nashville: Hotel

Hotel at 2511 Mcgavock Pike, Nashville was permitted on August 25, 2025 with a stated construction value of $5M to $10M. FOUR STORY SLAB-ON-GRADE, WOOD FRAMED BUILDING WITH LOW SLOPE ROOF. AUTOMATIC SPRINKLER SYSTEM IS PROVIDED PER NFPA 13 STANDARDS. BUILDING IS USED FOR GUESTROOMS, REGISTRATION, LAUNDRY AND MECHANICAL AND ELECTRICAL ROOMS. STAIR ENCLOSURES ARE PROTECTED BY A… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2511 Mcgavock Pike, Nashville |
| Project | Hotel |
| Building type | Commercial |
| Work | New building |
| Permit issued | August 25, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “FOUR STORY SLAB-ON-GRADE, WOOD FRAMED BUILDING WITH LOW SLOPE ROOF. AUTOMATIC SPRINKLER SYSTEM IS PROVIDED PER NFPA 13 STANDARDS. BUILDING IS USED FOR GUESTROOMS, REGISTRATION, LAUNDRY AND MECHANICAL AND ELECTRICAL ROOMS. STAIR ENCLOSURES ARE PROTECTED BY A…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1320 Adams St: Mixed-Use Building Renovation
- 705 A Justice Way: Campus Building
- 8283 River Road Pike: Campus Building
- 2401 Parman Pl: Institutional Project Renovation
- 1680 Reynolds Rd: Warehouse Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2511 Mcgavock Pike?
Hotel. FOUR STORY SLAB-ON-GRADE, WOOD FRAMED BUILDING WITH LOW SLOPE ROOF. AUTOMATIC SPRINKLER SYSTEM IS PROVIDED PER NFPA 13 STANDARDS. BUILDING IS USED FOR GUESTROOMS, REGISTRATION, LAUNDRY AND MECHANICAL AND ELECTRICAL ROOMS. STAIR ENCLOSURES ARE PROTECTED BY A…
When was the permit issued for 2511 Mcgavock Pike?
August 25, 2025, by Metro Nashville and Davidson County.
Who is building 2511 Mcgavock Pike?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2511 Mcgavock Pike need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.