2591 Dundas St W, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 2591 Dundas St W, Toronto was permitted on May 30, 2025 with a stated construction value of under $1M. Proposal for interior alterations to all floors and elevatior shaft. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2591 Dundas St W, Toronto |
| Neighbourhood | Junction Area |
| Project | Office and Tenant Fit-Out |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | May 30, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alterations to all floors and elevatior shaft”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since January 20251 other permit at this address
- January 6, 2025Addition or alteration: excavation and shoring · under $1M
- May 30, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- June 11, 2025Plumbing
- July 21, 2025Mechanical
- April 1, 2026Designated Structures
- July 15, 2026Addition or alteration: elevator · under $1M
- June 2025Estimated construction start (estimate)
- December 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 980 Lansdowne AveNew construction · $25M to $50M · December 2025
- 2340 Dundas St WAddition or alteration: demolition · $1M to $5M · July 2026
- 1884 Davenport RdAddition or alteration: roofing · $1M to $5M · May 2026
- 19 Wiltshire AveFire and life safety: fire protection · $1M to $5M · February 2026
- 2290 Dundas St WAddition or alteration: interior alteration · $1M to $5M · April 2026
11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2025 – Dec 2025 | Estimate |
| Fire Protection | Jul 2025 – Sep 2025 | Window passed (est.) |
| Signage and Wayfinding | Sep 2025 – Oct 2025 | Window passed (est.) |
| Insulation | Aug 2025 – Sep 2025 | Window passed (est.) |
| Drywall | Aug 2025 – Sep 2025 | Window passed (est.) |
| Low Voltage and Data | Aug 2025 – Sep 2025 | Window passed (est.) |
| Tile | Aug 2025 – Sep 2025 | Window passed (est.) |
| Cabinetry and Millwork | Aug 2025 – Sep 2025 | Window passed (est.) |
| Flooring | Aug 2025 – Sep 2025 | Window passed (est.) |
| Countertops | Aug 2025 – Sep 2025 | Window passed (est.) |
| Finish Carpentry | Aug 2025 – Sep 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2025) to the estimated completion (December 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 3200 Dundas St W: Commercial Project Renovation
- 2306 St Clair Ave W: Office and Tenant Fit-Out
- 2948 Dundas St W: Office and Tenant Fit-Out
- 90 Weston Rd: Office and Tenant Fit-Out
- 53 Flerimac Rd: Retail Building
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2591 Dundas St W?
Office and Tenant Fit-Out. Proposal for interior alterations to all floors and elevatior shaft
When was the permit issued for 2591 Dundas St W?
May 30, 2025, by the City of Toronto.
Who is building 2591 Dundas St W?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2591 Dundas St W need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.