263 Dupont St, Toronto: Transit Facility Renovation

Transit Facility Renovation at 263 Dupont St, Toronto was permitted on May 5, 2026 with a stated construction value of $5M to $10M. Proposal to replace the existing subway ventilation equipment and all associated services including ventilation fans, shaft dampers and silencers as applicable at the TTC Dupont Subway Station. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 263 Dupont St, Toronto |
| Project | Transit Facility Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | May 5, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Toronto Transit Commission (TTC) |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to replace the existing subway ventilation equipment and all associated services including ventilation fans, shaft dampers and silencers as applicable at the TTC Dupont Subway Station”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1 King's College Crcl: Industrial Building Renovation
- 100 Underhill Dr: School Renovation
- 200 King St W: Office and Tenant Fit-Out
- 2235 Sheppard Ave E: Office and Tenant Fit-Out
- 300 Consilium Pl: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 263 Dupont St?
Transit Facility Renovation. Proposal to replace the existing subway ventilation equipment and all associated services including ventilation fans, shaft dampers and silencers as applicable at the TTC Dupont Subway Station
When was the permit issued for 263 Dupont St?
May 5, 2026, by the City of Toronto.
Who is building 263 Dupont St?
Toronto Transit Commission (TTC) is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 263 Dupont St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.