28 Algoma St, Toronto: Rental Building Renovation

Rental Building Renovation at 28 Algoma St, Toronto was permitted on November 20, 2025 with a stated construction value of under $1M. Proposal for addition to the basement rear, interior alterations throughout, second floor wooden deck and walkout. (4 rental units-Fourplex)Thunder Woman Healing Lodge Society. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 28 Algoma St, Toronto |
| Neighbourhood | Mimico-Queensway |
| Project | Rental Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | November 20, 2025 |
| Housing units | 4 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for addition to the basement rear, interior alterations throughout, second floor wooden deck and walkout. (4 rental units-Fourplex)Thunder Woman Healing Lodge Society”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- November 20, 2025Small Residential Projects: Rental Building Renovation · under $1M (this page)
- December 11, 2025Plumbing
- December 19, 2025Mechanical
- December 2025Estimated construction start (estimate)
- June 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 230 Royal York RdConditional Permit: demolition · $10M to $25M · August 2026
- 20 Queen Elizabeth BlvdNew building · $1M to $5M · December 2025
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Dec 2025 – Jun 2026 | Estimate |
| Construction Site Security | Dec 2025 – Jan 2026 | Window passed (est.) |
| Painting | Dec 2025 – Feb 2026 | Window passed (est.) |
| Masonry | Dec 2025 – Jan 2026 | Window passed (est.) |
| Waterproofing | Dec 2025 – Jan 2026 | Window passed (est.) |
| Roofing | Jan 2026 – Feb 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Dec 2025 – Feb 2026 | Window passed (est.) |
| Electrical | Jan 2026 – Feb 2026 | Window passed (est.) |
| HVAC and Mechanical | Jan 2026 – Feb 2026 | Window passed (est.) |
| Plumbing | Jan 2026 – Feb 2026 | Window passed (est.) |
| Fire Protection | Jan 2026 – Feb 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 50 Torlake Cres: Industrial Building Renovation
- 21 Louisa St: Apartment Building Renovation
- 430 Royal York Rd: Commercial Project Renovation
- 66 George St: 3-Storey Retail Building Renovation
- 130 Horner Ave: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 28 Algoma St?
Rental Building Renovation. Proposal for addition to the basement rear, interior alterations throughout, second floor wooden deck and walkout. (4 rental units-Fourplex)Thunder Woman Healing Lodge Society
When was the permit issued for 28 Algoma St?
November 20, 2025, by the City of Toronto.
Who is building 28 Algoma St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 28 Algoma St need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.