280 Quebec Ave, Toronto: School Renovation

School Renovation at 280 Quebec Ave, Toronto was permitted on June 29, 2026 with a stated construction value of $1M to $5M. PROPOSED SHORTENING THE HEIGHT OF THE EXISTING RADIAL BRICK CHIMNEY FROM 22m ABOVE ROOF LEVEL TO 3m. PROJECT ALSO INCLUDES MISCELLANEOUS STRUCTURAL SUPPORTS FOR MECHANICAL HEATING PLANT REPLACEMENT WORK. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 280 Quebec Ave, Toronto |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 29, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “PROPOSED SHORTENING THE HEIGHT OF THE EXISTING RADIAL BRICK CHIMNEY FROM 22m ABOVE ROOF LEVEL TO 3m. PROJECT ALSO INCLUDES MISCELLANEOUS STRUCTURAL SUPPORTS FOR MECHANICAL HEATING PLANT REPLACEMENT WORK”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 100 Pine St: School Renovation
- 105 Wingold Ave: Office and Tenant Fit-Out
- 1333 Neilson Rd: Office and Tenant Fit-Out
- 151 Yonge St: Office and Tenant Fit-Out
- 2222 Ellesmere Rd: School Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 280 Quebec Ave?
School Renovation. PROPOSED SHORTENING THE HEIGHT OF THE EXISTING RADIAL BRICK CHIMNEY FROM 22m ABOVE ROOF LEVEL TO 3m. PROJECT ALSO INCLUDES MISCELLANEOUS STRUCTURAL SUPPORTS FOR MECHANICAL HEATING PLANT REPLACEMENT WORK
When was the permit issued for 280 Quebec Ave?
June 29, 2026, by the City of Toronto.
Who is building 280 Quebec Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 280 Quebec Ave need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
