29 Varennes Ct, Little Rock: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 29 Varennes Ct, Little Rock was permitted on February 20, 2025 with a stated construction value of $1M to $5M. 2 level plus walkout partially finished basement total 3 levels lot falls front to back car garage 5 bedrooms 6 full bath half 1 pool foyer main living room office kitchen pantry with second cooktop formal dining covered courtyard balcony in study prayer play… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 29 Varennes Ct, Little Rock |
| Project | Office and Tenant Fit-Out |
| Building type | Residential |
| Work | New building |
| Permit issued | February 20, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “2 level plus walkout partially finished basement total 3 levels lot falls front to back car garage 5 bedrooms 6 full bath half 1 pool foyer main living room office kitchen pantry with second cooktop formal dining covered courtyard balcony in study prayer play…”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Little Rock
- 10900 N Rodney Parham Rd: Place of Worship Renovation
- 5100 Country Club Blvd: Office and Tenant Fit-Out
- 44 Miramont Cir: Office and Tenant Fit-Out
- 9500 Birdwood Dr: Commercial Project
- 17724 Cantrell Rd: Office and Tenant Fit-Out
All of them: construction projects in Little Rock by address. The data is Little Rock's own building permits. Neighbouring cities issue their own permits and are not in this count. North Little Rock and Conway have their own feeds.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 29 Varennes Ct?
Office and Tenant Fit-Out. 2 level plus walkout partially finished basement total 3 levels lot falls front to back car garage 5 bedrooms 6 full bath half 1 pool foyer main living room office kitchen pantry with second cooktop formal dining covered courtyard balcony in study prayer play…
When was the permit issued for 29 Varennes Ct?
February 20, 2025, by the City of Little Rock.
Who is building 29 Varennes Ct?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 29 Varennes Ct need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
