30 Ellerslie Ave, Toronto: Transit Facility Renovation

Transit Facility Renovation at 30 Ellerslie Ave, Toronto was permitted on October 21, 2025 with a stated construction value of $1M to $5M. Proposal for replacement of asphalt paving and cooling tower. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 30 Ellerslie Ave, Toronto |
| Neighbourhood | Willowdale West |
| Project | Transit Facility Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | October 21, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Co-X-Co Construction Ltd. |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for replacement of asphalt paving and cooling tower”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 5150 Yonge St: Office and Tenant Fit-Out
- 5160 Yonge St: Office and Tenant Fit-Out
- 5140 Yonge St: Office and Tenant Fit-Out
- 1 Dromore Cres: Residential Project Renovation
- 1 Ibms Ward 05: Transit Facility Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 30 Ellerslie Ave?
Transit Facility Renovation. Proposal for replacement of asphalt paving and cooling tower
When was the permit issued for 30 Ellerslie Ave?
October 21, 2025, by the City of Toronto.
Who is building 30 Ellerslie Ave?
Co-X-Co Construction Ltd. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 30 Ellerslie Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
