30 Wellington St W, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 30 Wellington St W, Toronto was permitted on September 9, 2025 with a stated construction value of under $1M. Proposed interior alterations back to base - taking the old Druxys space and bringing it back to base building standards for future project. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address30 Wellington St W, Toronto
NeighbourhoodYonge-Bay Corridor
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedSeptember 9, 2025
Stated construction valueunder $1M
Estimated stageLikely complete
Company named on the permitModern Niagara Inc.
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed interior alterations back to base - taking the old Druxys space and bringing it back to base building standards for future project”

Where this project is

  1. Since September 20251 other permit at this address
  2. September 9, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  3. September 17, 2025Mechanical
  4. February 26, 2026Plumbing
  5. February 27, 2026Mechanical
  6. March 10, 2026Addition or alteration: mechanical
  7. June 15, 2026Addition or alteration: interior alteration
  8. September 2025Estimated construction start (estimate)
  9. April 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby: 5 more renovations within 1 km

  • 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
  • 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
  • 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
  • 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
  • 81 Bay StAddition or alteration: interior alteration · $25M to $50M · December 2025

66 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 30 Wellington St W?

Office and Tenant Fit-Out. Proposed interior alterations back to base - taking the old Druxys space and bringing it back to base building standards for future project

When was the permit issued for 30 Wellington St W?

September 9, 2025, by the City of Toronto.

Who is building 30 Wellington St W?

Modern Niagara Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 30 Wellington St W need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.