305 Port Union Rd, Toronto: Retail Building Renovation

Retail Building Renovation at 305 Port Union Rd, Toronto was permitted on October 6, 2025 with a stated construction value of under $1M. Proposal to replace and restore canopy, roof and storefronts where damaged by attempted robbery (Vehicle Impact Damage). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 305 Port Union Rd, Toronto |
| Neighbourhood | West Rouge |
| Project | Retail Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | October 6, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to replace and restore canopy, roof and storefronts where damaged by attempted robbery (Vehicle Impact Damage)”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- July 10, 2018Plumbing
- July 10, 2018Mechanical
- July 8, 2024Plumbing
- July 8, 2024Mechanical: plumbing
- July 8, 2024Addition or alteration: plumbing · under $1M
- October 6, 2025Addition or alteration: Retail Building Renovation · under $1M (this page)
- November 2025Estimated construction start (estimate)
- May 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Nov 2025 – May 2026 | Estimate |
| Fire Protection | Dec 2025 – Jan 2026 | Window passed (est.) |
| Signage and Wayfinding | Jan 2026 – Mar 2026 | Window passed (est.) |
| Insulation | Dec 2025 – Jan 2026 | Window passed (est.) |
| Drywall | Dec 2025 – Jan 2026 | Window passed (est.) |
| Low Voltage and Data | Dec 2025 – Jan 2026 | Window passed (est.) |
| Tile | Dec 2025 – Feb 2026 | Window passed (est.) |
| Cabinetry and Millwork | Dec 2025 – Jan 2026 | Window passed (est.) |
| Flooring | Dec 2025 – Feb 2026 | Window passed (est.) |
| Countertops | Dec 2025 – Feb 2026 | Window passed (est.) |
| Finish Carpentry | Dec 2025 – Feb 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (November 2025) to the estimated completion (May 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 7431 Kingston Rd: Restaurant Renovation
- 65 Rylander Blvd: Office and Tenant Fit-Out
- 53 Flerimac Rd: Retail Building
- 72 Bexhill Ave: Residential Project
- 828 Shaw St: 3-Storey Townhomes
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 305 Port Union Rd?
Retail Building Renovation. Proposal to replace and restore canopy, roof and storefronts where damaged by attempted robbery (Vehicle Impact Damage)
When was the permit issued for 305 Port Union Rd?
October 6, 2025, by the City of Toronto.
Who is building 305 Port Union Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 305 Port Union Rd need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.