3080 Yonge St, Toronto: Parking Structure Renovation
Follow this project · we email you when its status or build stage changes

Parking Structure Renovation at 3080 Yonge St, Toronto was permitted on September 1, 2026 with a stated construction value of under $1M. Proposed Parking Garage Localized Repairs. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3080 Yonge St, Toronto |
| Project | Parking Structure Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | September 1, 2026 |
| Stated construction value | under $1M |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed Parking Garage Localized Repairs”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 200378 other permits at this address
- July 15, 2014Addition or alteration: interior alteration · under $1M
- March 4, 2015Addition or alteration: interior alteration · under $1M
- July 29, 2015Addition or alteration: interior alteration · under $1M
- August 13, 2015Addition or alteration: interior alteration · under $1M
- April 12, 2021Addition or alteration · under $1M
- September 1, 2026Addition or alteration: Parking Structure Renovation · under $1M (this page)
- October 2026Estimated construction start (estimate)
- April 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
Builtie stages each project as it moves; the trades open on it change week to week.
Find work like this in Toronto
Leads for your trade: every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 72 Bexhill Ave: Residential Project
- 890 Dundas St W: Retail Building Renovation
- 2115 Finch Ave W: Office and Tenant Fit-Out
- 45 Industrial St: Apartment Building Renovation
- 151 Front St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3080 Yonge St?
Parking Structure Renovation. Proposed Parking Garage Localized Repairs
When was the permit issued for 3080 Yonge St?
September 1, 2026, by the City of Toronto.
Who is building 3080 Yonge St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3080 Yonge St need now?
It depends on the stage; Builtie tracks it.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
