309 Rosewell Ave, Toronto: Single-Family House Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Single-Family House Renovation at 309 Rosewell Ave, Toronto was permitted on November 10, 2025 with a stated construction value of $1M to $5M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address309 Rosewell Ave, Toronto
NeighbourhoodLawrence Park South
ProjectSingle-Family House Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedNovember 10, 2025
Stated construction value$1M to $5M
Estimated stageFraming
Company named on the permitAspekt7 Construction Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. November 10, 2025Small Residential Projects: Single-Family House Renovation · $1M to $5M (this page)
  2. November 10, 2025Drains and site services: addition
  3. November 10, 2025Plumbing: addition
  4. December 2025Estimated construction start (estimate)
  5. December 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Other big projects nearby

11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Dec 2025 – Dec 2026Estimate
Construction Site SecurityNov 2025 – Feb 2026Window passed (est.)
PaintingDec 2025 – Apr 2026Window passed (est.)
MasonryDec 2025 – Feb 2026Window passed (est.)
WaterproofingDec 2025 – Feb 2026Window passed (est.)
RoofingJan 2026 – Mar 2026Window passed (est.)
Windows, Doors and GlazingDec 2025 – Mar 2026Window passed (est.)
ElectricalFeb 2026 – Apr 2026Window passed (est.)
HVAC and MechanicalFeb 2026 – Apr 2026Window passed (est.)
PlumbingJan 2026 – Apr 2026Window passed (est.)
Fire ProtectionFeb 2026 – Apr 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 309 Rosewell Ave?

Single-Family House Renovation. Renovation or addition to a single-family house.

When was the permit issued for 309 Rosewell Ave?

November 10, 2025, by the City of Toronto.

Who is building 309 Rosewell Ave?

Aspekt7 Construction Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 309 Rosewell Ave need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.