3205 Whites Creek Pike, Nashville: Warehouse Renovation

Warehouse Renovation at 3205 Whites Creek Pike, Nashville was permitted on February 28, 2025 with a stated construction value of $10M to $25M. To conduct renovations to existing UPS center with new conveyor systems and automated consolidated bagging system. no change to footprint. bb poc david meiners. No trades will be included with this permit.***. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3205 Whites Creek Pike, Nashville |
| Project | Warehouse Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | February 28, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To conduct renovations to existing UPS center with new conveyor systems and automated consolidated bagging system. no change to footprint. bb poc david meiners. No trades will be included with this permit.***”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1311 21st Ave S: Healthcare Building Renovation
- 711 Justice Way: Campus Building
- 800 Monroe St: Retail Building Renovation
- 1301 Medical Center Dr: Institutional Project Renovation
- 3901 Stewarts Ln: Warehouse
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3205 Whites Creek Pike?
Warehouse Renovation. To conduct renovations to existing UPS center with new conveyor systems and automated consolidated bagging system. no change to footprint. bb poc david meiners. No trades will be included with this permit.***
When was the permit issued for 3205 Whites Creek Pike?
February 28, 2025, by Metro Nashville and Davidson County.
Who is building 3205 Whites Creek Pike?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3205 Whites Creek Pike need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
