3250 Bloor St W, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 3250 Bloor St W, Toronto was permitted on February 4, 2026 with a stated construction value of $1M to $5M. Proposal for interior alterations to commercial offices, medical clinics, lounge areas, common corridor, and communal gym space. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3250 Bloor St W, Toronto |
| Neighbourhood | Islington |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | February 4, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | DJH Construction Ltd. |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for interior alterations to commercial offices, medical clinics, lounge areas, common corridor, and communal gym space”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 8 Lomond Dr: Hotel Renovation
- 3300 Bloor St W: Office and Tenant Fit-Out
- 300-304 The East Mall: 30-Storey Mixed-Use Building Renovation
- 4 Avenue Rd: Commercial Project Renovation
- 120 Bloor St E: School Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3250 Bloor St W?
Office and Tenant Fit-Out. Proposal for interior alterations to commercial offices, medical clinics, lounge areas, common corridor, and communal gym space
When was the permit issued for 3250 Bloor St W?
February 4, 2026, by the City of Toronto.
Who is building 3250 Bloor St W?
DJH Construction Ltd. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 3250 Bloor St W need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
