33 Carlson Crt, Toronto: 5-Storey Retail Building

5-Storey Retail Building at 33 Carlson Crt, Toronto was permitted on August 19, 2025 with a stated construction value of $1M to $5M. Proposed 1.5 storey open air parking structure. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 33 Carlson Crt, Toronto |
| Neighbourhood | West Humber-Clairville |
| Project | 5-Storey Retail Building |
| Building type | Commercial |
| Work | New building |
| Permit issued | August 19, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposed 1.5 storey open air parking structure”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 400 Carlingview Dr: 2-Storey Warehouse Renovation
- 50 Woodbine Downs Blvd: Warehouse Renovation
- 927 Dixon Rd: Retail Building Renovation
- 80 Enterprise Rd: Warehouse Renovation
- 263 Carrier Dr: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 33 Carlson Crt?
5-Storey Retail Building. Proposed 1.5 storey open air parking structure
When was the permit issued for 33 Carlson Crt?
August 19, 2025, by the City of Toronto.
Who is building 33 Carlson Crt?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 33 Carlson Crt need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
