3350 Victoria Park Ave, Toronto: Transit Facility Renovation
Follow this project · we email you when its status or build stage changes

Transit Facility Renovation at 3350 Victoria Park Ave, Toronto was permitted on October 20, 2026 with a stated construction value of $10M to $25M. Proposal for repair of tip floor, Upgrades to HVAC system, Upgrades to electrical substation, Replacement of roofing and guardrail. Note that there is no existing life safety system in this building. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3350 Victoria Park Ave, Toronto |
| Project | Transit Facility Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | October 20, 2026 |
| Stated construction value | $10M to $25M |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for repair of tip floor, Upgrades to HVAC system, Upgrades to electrical substation, Replacement of roofing and guardrail. Note that there is no existing life safety system in this building”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since December 20041 other permit at this address
- December 10, 2004Addition or alteration
- June 22, 2012Addition or alteration
- August 7, 2014Drains and site services
- May 9, 2016Fire and life safety
- October 21, 2016Addition or alteration: fire protection
- October 20, 2026Addition or alteration: Transit Facility Renovation ยท $10M to $25M (this page)
- December 2026Estimated construction start (estimate)
- June 2028Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 20 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
Builtie stages each project as it moves; the trades open on it change week to week.
Find work like this in Toronto
Leads for your trade: every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1615 Dufferin St: 2-Storey Affordable Housing Renovation
- 35 Camden St: Residential Project Renovation
- 63 Cobden St: 2-Storey Single-Family House
- 520 Ellesmere Rd: Office and Tenant Fit-Out
- 120 Bremner Blvd: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3350 Victoria Park Ave?
Transit Facility Renovation. Proposal for repair of tip floor, Upgrades to HVAC system, Upgrades to electrical substation, Replacement of roofing and guardrail. Note that there is no existing life safety system in this building
When was the permit issued for 3350 Victoria Park Ave?
October 20, 2026, by the City of Toronto.
Who is building 3350 Victoria Park Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3350 Victoria Park Ave need now?
It depends on the stage; Builtie tracks it.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.