34 Grove Ave, Toronto: 3-Storey Single-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

3-Storey Single-Family House at 34 Grove Ave, Toronto was permitted on September 28, 2026 with a stated construction value of $1M to $5M. New single-family house, 3 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address34 Grove Ave, Toronto
Project3-Storey Single-Family House
Building typeResidential
WorkNew building
Storeys3
Permit issuedSeptember 28, 2026
Housing units1
Stated construction value$1M to $5M
Estimated stagePermit
Company named on the permitWhitaker Construction Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. September 28, 2026Plumbing: demolition
  2. September 28, 2026New construction: 3-Storey Single-Family House ยท $1M to $5M (this page)
  3. September 28, 2026Drains and site services: demolition
  4. September 28, 2026Demolition
  5. October 2026Estimated construction start (estimate)
  6. October 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 6 to approach now, 1 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2026 – Oct 2027Estimate
Excavation and Site WorkSep 2026 – Oct 2026Approach now
Construction Site SecuritySep 2026 – Dec 2026Approach now
Concrete and FoundationOct 2026 – Nov 2026Approach now
Structural SteelOct 2026 – Dec 2026Approach now
ElevatorsOct 2026 – Jan 2027Approach now
FramingOct 2026 – Jan 2027Approach now
PaintingNov 2026 – Mar 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (October 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 34 Grove Ave?

3-Storey Single-Family House. New single-family house, 3 storeys.

When was the permit issued for 34 Grove Ave?

September 28, 2026, by the City of Toronto.

Who is building 34 Grove Ave?

Whitaker Construction Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 34 Grove Ave need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing. Coming up: painting from November 2026.